Unit 1, Radway Road Industrial Estate, Shirley, Solihull

Home · Services · EV charging

commercial

EV charge point installation

Design, supply and installation of home and workplace EV chargers, including myenergi units, with a load check before connection.

A dedicated point, not a trailing lead

RCH installs electric vehicle charge points for households, workplaces and fleets. A dedicated point charges faster than a 13 amp socket and avoids running extension leads through windows. Chargers are usually fixed to an outside wall beside the parking place, though the right spot depends on the property.

The company is an accredited installer of myenergi chargers and also fits other certified charge points. Published examples include a 3.6 kW charger taking up to about 12 hours for a full charge, and a 7 kW myenergi unit taking around 7 hours. A later guide says RCH supplies and installs myenergi 7.5 kW and 22 kW chargers, and that 7.5 kW is the size most people ask for. The right rating depends on the car and the supply.

The supply has to be able to take it

RCH carries out a load check and deals with the distribution network operator application. Their own case notes describe an emergency visit where a neighbour’s charger had been connected to an unsuitable shared service head; the point of that account is that a competent installer checks the supply and notifies the DNO before the charger is connected.

They have said a straightforward installation can take around two hours. Cost varies with the wiring, the charger and any supply upgrade, and is quoted rather than listed. A free site survey is the first step.

Included

  • myenergi chargers, plus other certified points
  • Home, workplace and fleet installations
  • Load check and DNO notification
  • 7 kW, 7.5 kW and 22 kW options they have published
  • Free site survey
Call 0121 628 5430 Survey