Getting an EV charger installed

The questions RCH answers before fitting a home or workplace charge point, including supply checks and charger sizes.

A charge point needs its own circuit and its own protection, plus a check that the supply to the property can carry the extra load. RCH’s guide is blunt about DIY installation: the risks include fire and shock, and a certified installer is also how the notification to the relevant body gets done.

RCH is an accredited installer of myenergi chargers and also fits other certified points. The process they describe starts with a load check on the local supply, which decides what size of charger the property can have. They have written that they supply and install myenergi 7.5 kW and 22 kW units. Elsewhere they compare a 3.6 kW unit, which they said can take up to about 12 hours, with a 7 kW myenergi unit at around 7 hours. The kilowatt figure on the charger is the rate power is delivered; a higher number charges the car sooner and asks more of the supply.

Time and cost

They have said a straightforward install takes around two hours, covering the new circuit and the checks. Cost is not listed. It moves with the existing wiring, whether the supply can take the load, and the charger itself — anything from a low-powered external socket up to a 22 kW point, with 7.5 kW the size they described as the popular choice.

Ask the office for a survey. The same team fits single home points and larger numbers of chargers for a workplace fleet.